Floor Joists & Roto Rooter

Yesterday’s rain finally took a break (after 1-1/2″) and the framers got most of the floor joists in. Enough for plumbers to start tomorrow.

The failing waste line couldn’t wait a few more weeks until it was decommissioned and required another visit from Roto Rooter, didn’t need that $250 anyway. He was done soon enough but then proceeded to get stuck in the muddy driveway for the next 20 minutes. Luckily the tractor was up to the job and freed him twice until he got all four bald tires on dry gravel. I probably should drive up the road to see if he’s not stuck in the ditch somewhere.

Once again, baby slept through all sorts of noise, but I still work around her nap time which does slow down progress quite a bit.

Leave a Reply

Your email address will not be published. Required fields are marked *